I360 TOWER

The Main Contractor on this unique project required assistance with specification and selection of various specialist construction chemicals including Structural Waterproofing solutions, Structural Grouts and Concrete Repair. One particular requirement was the specification of a 100 N/mm² non-shrink cementitous grout to be poured under the base of the i360 tower. The tower was constructed from sections called “cans” and the bottom section would need to be structurally grouted in and rest on a bed of 100 N/mm² structural grout.

FIS worked with the contractor and design team to provide Teknodure HS which is a high strength grout meeting the required 100kN strength requirements. FIS worked closely with the engineers to ensure the width and depth of placement was suitable for the grout. The grout is a cementitous grout which meant that mixing and placement was as simple as it could be. This was a recognised benefit to the contractor as the site was a high profile site in a very public location on Brighton beach, logistics and placement of construction chemicals had to be kept as simple as possible to ensure a smooth running project.